Use this checklist from 8 weeks before the move to 48 hours after. If you want one party to own it, Go-Live Assistance starts from A$750 ex GST and takes the site from first walk-through to go-live.
Carrier orders and a fallback circuit, comms room power and cooling, and the cabling plan. The A$290 site assessment (up to 90 minutes on site, report within 48 hours) can pin down the scope of works here.
Cabling pulled, tested and labelled, patch panel terminated, rack and UPS ready, and as-builts in hand.
Photograph the rack, then power up in order.
Check every port, Wi-Fi, phones and backups, and update the documentation.
Inheriting the previous tenant's cabling? See what to check before you rely on it.
1,000+ sites taken over and taken live.